Summary
The Customer Item Mapping screen moves a customer's sales of one item to another item, for example when you switch that customer to a new part number. The old item's forecast drops and the new item's forecast rises.
It is accessible by clicking Admin > System Configuration > Customer Item Mapping, under Customers > Customer Demand Mapping. You need the Edit Customer Mappings permission to see it.
To move only some ship-tos of a customer, use Customer Ship-To Item Mapping. To move every customer to a new item, use Item Site Replacements instead.
IMPORTANT: Mappings are applied during StockIQ's next refresh, and only to sales that have already happened. A mapping cannot move the forecast starting on a future date; see Planning for a move on a future date below.
Grid Columns
To add a mapping, click the + icon at the right-hand side of the grid, fill in the new line, and click Save.
- Customer- The customer that is switching items. The mapping covers all of that customer's ship-tos.
- Old Item- The item the customer used to buy. Its matching sales move out of this item's demand history.
- New Item- The item the customer buys now. The moved sales are added to this item's demand history, at the same site. If the new item is not stocked at that site, the sales are not moved.
- Date Effective- The day StockIQ starts applying the mapping. Until then, nothing is moved. If left blank, it applies right away.
- Date Expires- The day StockIQ stops applying the mapping. This is not commonly used.
- Start Date- The earliest sales StockIQ moves, by the order's demand date. Sales before this date stay where they are. If left blank, StockIQ moves sales from the beginning of the history.
- End Date- The latest sales StockIQ moves, by the order's demand date. Sales after this date stay where they are. If left blank, there is no end. This is not commonly used.
- Date Created and Date Updated- When the mapping was added and last changed.
- Note- Any note to help you remember why you added the mapping.
- Multiplier- Multiplies the quantity of each moved sale, for example when the new item comes in a different pack size. Leave it at 1 to move the quantities as they are.
NOTE: Item mappings run before site mappings, so a sale can move to a new item and then to a new site. A Ship-To Item Mapping takes priority over a Customer Item Mapping for the same ship-to.
How mappings are applied
- Only closed orders move. Open, released and on-hold orders stay on the item they will actually ship from, so inventory projections stay correct. Once an order closes, the next refresh moves it.
- Nothing moves until Date Effective. Date Effective and Date Expires control when the mapping is switched on. Start Date and End Date control which past sales are moved while it is on.
- The sales themselves move. StockIQ moves the matching sales order lines to the new item and remembers where they were originally sold. The demand history, and so the forecast, of both items changes after the next refresh.
IMPORTANT: A mapping moves sales that have already happened. A Start Date in the future moves nothing, because there are no closed sales after it yet, and the forecast does not change.
Planning for a move on a future date
A mapping cannot shift the forecast from the old item to the new one starting on a future date (for example, a customer switching to a new part number on January 1). You can choose between:
- Date Effective = today, Start Date blank- The past sales move at the next refresh, so the old item's forecast drops and the new one's rises right away, for every future period, including the months before the move.
- Date Effective = the move date, Start Date blank- Nothing changes until the move date. From the first refresh after it, the past sales move and both forecasts change.
To see the move in the forecast now, only from the move date onward:
- Adjust the forecast of both items from the move date onward (lower the old, raise the new) with a manual forecast or the Edit Forecasts window in Forecast Manager.
- Add the mapping with Date Effective set to the move date and Start Date left blank.
- After the move date, remove the manual adjustments, because the mapping now moves the history.